top of page
PROJECTS2

AMBUKLAO AND BINGA DAM REHABILITATION PROJECT

CLIENT :

LOCATION:

DURATION:

PROJECT DETAILS:

SCOPE OF WORKS:

McConnell Dowell Philippines, Inc

Ambuklao, Bokod, Benguet

March 2009- February 2012

Rehabilitaion and Construction of the Ambuklao and Binga Dam

- Survey Project Management
- Construction survey of Intake, outlet and switchyard
- Tunnel mark-up for excavation and checking of underbreaks and overbreaks
- Tunnel Formworks layout and checking
- As-built survey

© 2018 by McDonald Consultants Inc.

  • LinkedIn
  • Facebook
  • Instagram
bottom of page