top of page
PROJECTS2

HERMANA MAYOR BATHYMETRIC SURVEY AND CONTROL VERIFICATION SURVEY

CLIENT :

LOCATION:

DURATION:

PROJECT DETAILS:

SCOPE OF WORKS:

Sta. Cruz EcoTourism Development Corp.

Hermana mayor Island, Zambales

November - December 2017

Bathymetric Survey of the Coast of the Hermana Mayor Island

- Verification of existing survey controls
- Bathymetric survey up to 200m from the shoreline using SBES

© 2018 by McDonald Consultants Inc.

  • LinkedIn
  • Facebook
  • Instagram
bottom of page