top of page
PROJECTS2

MASBATE GOLD MINE PROJECT

CLIENT :

LOCATION:

DURATION:

PROJECT DETAILS:

SCOPE OF WORKS:

Filminera Resources Corporation

Aroroy, Masbate

March 2006

Verification of survey controls and Topographic Survey

- Verification Survey Location of existing photocontrol points using differential GPS
- Topographic survey of the mining area

© 2018 by McDonald Consultants Inc.

  • LinkedIn
  • Facebook
  • Instagram
bottom of page