top of page
PROJECTS2

UPPER WAWA DAM TEMPORARY ROAD SURVEY

CLIENT :

LOCATION:

DURATION:

PROJECT DETAILS:

SCOPE OF WORKS:

Prime BMD

San Mateo & Rodriguez, Rizal

January - May 2020

Temporary Road As-built Survey

- As-built Survey of Temporary Road Prior to and After Base Course Material Placement

© 2018 by McDonald Consultants Inc.

  • LinkedIn
  • Facebook
  • Instagram
bottom of page