top of page
PROJECTS2

WAWA 500MW HEPP TOPOGRAPHIC SURVEY OF PROPOSED SUBSTATION

CLIENT :

LOCATION:

DURATION:

PROJECT DETAILS:

SCOPE OF WORKS:

Olympia Violago Water and Power Inc

Antipolo, Rizal

November - December 2016

Topographic Survey of Proposed Substation

- Topographic Survey of Proposed Substation using RPAS

© 2018 by McDonald Consultants Inc.

  • LinkedIn
  • Facebook
  • Instagram
bottom of page