top of page
PROJECTS2

WAWA PUMPED STORAGE HYDROELECTRIC PROJECT

CLIENT :

LOCATION:

DURATION:

PROJECT DETAILS:

SCOPE OF WORKS:

Hydreq Philippines

Antipolo, Rizal

August - November 2015

Aerial Mapping using RPAS

- Establishment of Ground Control Points
- Orthophoto and DTM Generation by UAS photogrammetry
- Drill Hole Location Survey

© 2018 by McDonald Consultants Inc.

  • LinkedIn
  • Facebook
  • Instagram
bottom of page